In October of 2018, a massive renovation project began on the historic Milton Building (formerly known as Heritage Tower) in downtown Battle Creek. The nineteen-floor limestone building is one of the oldest in Battle Creek and has been renovated into beautiful new apartments.

RAM mobilized in a multi-phased effort to bring the historic façade back to its former glory; the scope of repairs necessary to do so included limestone patching, limestone crack repairs, and in some areas, limestone replacement with new pieces. Removal and replacement of sealants and mortar was also necessary, and a multi-step façade cleaning has proven effective in washing away years of dirt and debris.

After sitting vacant for nearly a decade, RAM has been proud to play a role in revitalizing this historic beauty!

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Get a Quote For Your Project

"I wanted to let you know that your guy did a good job for us. this project has several systemic problems. Vehicles getting stuck, and difficulty accessing the project. Your guy Jason was a real professional and worked with us to get the job done.  He even came in on Saturday during a time crunch. I really appreciate it!"

- Jim J., Ritsema
Project: Ferris State University

"During the work we did together at The Mill I had really enjoyed working with Jeff.  He knew the building and the work being completed and was willing to share his knowledge and experience with me.  In my experience working with him, I feel he greatly enhanced the quality of work, professionalism and commitment to restoring The Mill. He is a solid asset for RAM and someone that I look forward to working with in the future."

- Steve A., HopkinsBurns
Project: The Mill

"I wanted to take a minute let you both know what a pleasure it was working with each of you on the AJC Ramp Area Water Infiltration Repair Project.  However the main reason I am writing is inform you both of the outstanding performance of your lead foreman Brian.  His dedication to our project is to be commended. I hope that RAM is aware of the quality of his character and overall leadership."

- Michael F., Erie Affiliates, Inc
Project: AJC Ramp Area Water Infiltration Repair

"As we get closer to closing out this project I wanted to reach out and thank RAM construction and especially Aaron for all the hard work your team has accomplished. Aaron has gone above and beyond to ensure this project went smoothly and it has shown, We appreciate everything and look forward to working with you again on future projects."

- Jeremy P., Gray
Project: Spartan

"I would like to take this time and recognize Warren for his work on the Ford Hub project in Dearborn, MI as it relates to the foundation and under slab waterproofing and vapor mitigation systems. Warren has shown an extended dedication an effort to this project and assisted in our efforts to provide the customer with a quality product and installation. This particular project has had numerous challenges as it relates to the project design, manufacturer’s requirements, and stringent project schedule. Warren has shown an extended effort which include but not limited to immediate responsiveness to current work being put in place, issues resulting from inspections, managing and appropriating field crews for work in multiple areas, and assisting in resolving issues with the waterproofing and vapor mitigation systems. We appreciate his positive attitude on a daily basis, and consistent work ethic."

- Nick O., Aristeo
Project: Waterproofing and Vapor Mitigation Installation

"Jason provides astounding leadership, an acute ability to comprehend what needs to be done, and executes in an extremely timely fashion without sacrificing quality or safety. Since he joined our project team he has been very responsive, a go getter, and if we lived in a perfect world I believe the entire masonry restoration scope would have been complete before the first snow fall. He is also not shy about speaking out if there is an issue vs taking the easier route and passing the buck onto the next person or next trade or down the road leaving an issue for GRPS or RC to deal with. He has helped our team with expanding our knowledge on masonry work in general and has provided lessons that our team to take to the next project and beyond."

- Jason S., Rockford Construction

Featured Projects

Marquis Theatre

Located in the heart of downtown Northville, the Marquis Theatre has been the central entertainment landmark for the Detroit suburb since its initial construction in 1925.

Centennial Parking Structure

RAM Construction of Minnesota was hired by The State of Minnesota to perform concrete restoration on the Centennial Parking Structure which is located on The State Capital grounds in St. Paul.

WMU Student Center

RAM Construction of Grand Rapids provided a wide range of services on this project that included foundation waterproofing, air barrier, traffic coating, firestopping & spray foam insulation.

E-Mail Us

GENERAL INFO:

BIDS/QUOTES:

800-875-3800

Corporate Headquarters

13800 Eckles Road, Livonia, Michigan 48150
Phone: 734-464-3800
Fax: 734-464-1766

Michigan

Grand Rapids:
4175 Danvers Ct SE, Kentwood, Michigan 49512
Phone: 616-957-3679
Fax: 616-957-7778

Detroit:
719 Griswold St, Suite 250, Detroit, MI 48226
Phone: 313-965-6750
Fax: 313-965-6743

Minnesota

Minneapolis:
9937 Goodhue Street NE, Blaine, Minnesota 55449
Phone: 763-792-6713
Fax: 763-792-6601

Ohio

Cleveland:
100 Corporation Center Bldg #4, Broadview Hts., Ohio 44147
Phone: 440-740-0100
Fax: 440-740-0901

Toledo:
27 Broadway Street, Suite 100B, Toledo, OH 43604
Phone: 419-593-0031